Pipeline View Executive View
Production Intelligence Report

Executive Production
Dashboard

Operational Overview — GM & Director Visibility

05 May 2026 13 Jul 2026 14 Jul 2026
Filter:
05 May, 13 Jul, 14 Jul 2026 (Baseline Audit)
Total Output
223,600
pcs / sheets combined
Avg Daily Output
74,533
per day average
Active Machines
11/14
avg machines running
Machine Downtime
18%
OFF / idle instances
Output Trend

Daily Production Volume

-77% drop (13 Jul ? 14 Jul)
Machine Load

Utilization by Department

Job Status

Activity Breakdown

Top Runners

Highest Output Jobs

Department View

Machine & Department Activity Log

Viewing 3-Day Sample Baseline
Department 05 May 13 Jul 14 Jul Status Trend
WohlenbergCutting SBPDCGP, HallmarkIntermittent
Tinta (Ink)3 jobs RI3 jobs RI4 jobs (3 RI)Consistent
CD 10214,000 sheetsSetting5,000 pcsVariable
CX 10410,000 pcs12,300 pcs2,000 pcsDeclining
UV 1Shift 3MJCIntermittent
UV 2Shift 3MJCIntermittent
Youbond1,900 sheetsOFFOFFMostly Down
MKOFF (sparepart)2,400 pcs10,000 pcsRecovering
Novacut36,000 pcsSettingSettingSetup-heavy
Gaplok1,400 pcsBlankbox x2Proof/SettingLow output
Diana EyeOFFOFFSettingMostly Down
RolamSetting21,500 pcs14,000 pcsRamping Up
Ambition52,000 pcs43,000 pcsSelesai + SettingTop Performer
Manual5 tasks5 tasks8 tasksHigh workload
Dedel3 tasks2 tasksIntermittent
Key Takeaways

Executive Insights & Action Items

Critical: Output Collapse on 14 Jul

Production dropped 66% from 13 Jul (80,200) to 14 Jul (27,000). Multiple machines idle (Youbond, UV1, UV2, Windows Patching OFF). Root cause analysis needed — was this planned maintenance, material shortage, or demand-driven?

Concern: Youbond & Diana Eye Chronic Idle

Youbond OFF 2 out of 3 days. Diana Eye OFF 2 out of 3 days. Combined utilization is below 33%. Evaluate whether these machines are correctly allocated or if redeployment / maintenance scheduling is needed.

Strength: Ambition is Anchor Machine

Ambition delivered 95,000+ pcs across 2 active days (52K + 43K) — the single highest contributor at ~42% of total tracked output. This machine is the backbone; ensure preventive maintenance is prioritized.

Observation: Manual Section Overloaded

Manual sorting/assembly tasks increased from 5 to 8 tasks across the 3 days. This indicates growing dependency on manual labor — consider whether automation (e.g., auto-gluing, auto-sorting) could reduce bottleneck risk.

Setup-Heavy: Novacut & Gaplok

Novacut spent 2 of 3 days in "setting" mode with minimal output. Gaplok similarly low. High setup-to-run ratio suggests either short runs or changeover inefficiency. Review job scheduling to batch similar SKUs and reduce changeover time.

Positive: MK Recovery After Downtime

MK went from OFF (waiting for sparepart belt timing) on 05 May to 2,400 pcs on 13 Jul and 10,000 pcs on 14 Jul. Good recovery trajectory. Monitor to ensure sustained output.

Recommended Actions

For GM / Director Review

Investigate 14 Jul Drop

Request root cause report from production supervisor. Was it material, manpower, or machine-related?

Audit Idle Machines

Review Youbond & Diana Eye utilization. Consider maintenance windows or reallocation of capacity.

Reduce Manual Dependency

Manual section workload trending up. Evaluate ROI on automation for sorting, gluing, and packing tasks.